TakeoffConvertAIFree Tool

What Should I Charge for Bathroom Remodeling? (2026 Contractor Pricing Guide)

Short answer

Most remodelers charge about $12,000 to $23,000 for a mid-range full bathroom remodel, roughly $4,000 to $7,400 for a tub-to-shower conversion, and $940 to $1,750 to supply and install a vanity, before permits and hidden repairs. Labor is a little over half the price; demo of a full bathroom runs about $1,200 to $2,600 on its own line.

Bathroom Remodeling unit prices by work item

Enter a ZIP code to adjust every row to local cost levels. Rates start from a national baseline of 1.00 and scale by the published city cost index for that area.

Showing national baseline rates.

Bathroom Remodeling unit pricing: what to charge per unit, all in
Work itemUnitMaterialLaborWhat to charge
Full bathroom remodel, mid-range (5x8 to 8x10)
Moving plumbing, tile height, and fixture grade move this more than room size.
bathroom$6,500$7,000$12,224 to $22,701
Tub-to-shower conversion, tiled
Drain relocation, glass door, and niche or bench detail add up fast.
each$1,800$2,600$3,996 to $7,422
Vanity, top and faucet, supplied and installed
Stock versus custom, single versus double, and supply line changes drive it.
each$700$350$943 to $1,752
Toilet, supplied and installed
Flange repair and subfloor damage under the old toilet are extra.
each$280$220$451 to $838
Demo full bathroom to studs, with haul-off
Cast iron tubs, mud-set tile, and disposal fees push this to the top.
bathroom$150$1,300$1,239 to $2,573
Bath exhaust fan, new or replacement
Venting to the exterior and new circuit work are the expensive parts.
each$120$230$319 to $592

Material and labor columns are bare cost per unit before markup. The charge column applies +15% materials, +20% labor, then +10% overhead and profit, and shows a realistic range rather than one false-precision number.

How this number is built

There is no proprietary data feed here and nothing is hidden. Every figure above comes from four visible steps, which is exactly how your own price book should work:

  1. 1Start from bare material and bare labor cost per unit, at a national baseline.
  2. 2Multiply both by your local cost factor, from the ZIP table below.
  3. 3Add markup: 15% on materials, 20% on labor. This covers waste, procurement and supervision.
  4. 4Add 10% overhead and profit on the marked-up subtotal, then show a range rather than one number.

Regional cost factors

A national average is close to useless on its own. The same bathroom remodeling job prices very differently across markets. These are the multipliers applied above, against a 1.00 national baseline.

MetroFactorFull bathroom remodel, mid-range (5x8 to 8x10) (bathroom)
San Francisco, CA1.38x$16,869 to $31,328
New York, NY1.32x$16,135 to $29,966
Boston, MA1.24x$15,157 to $28,150
Los Angeles, CA1.22x$14,913 to $27,696
Seattle, WA1.20x$14,668 to $27,242
Chicago, IL1.18x$14,424 to $26,787
Washington, DC1.15x$14,057 to $26,106
Denver, CO1.08x$13,202 to $24,517
Austin, TX1.04x$12,713 to $23,609
Phoenix, AZ1.02x$12,468 to $23,155
Atlanta, GA1.00x$12,224 to $22,701
Houston, TX0.98x$11,979 to $22,247

Before you send this number to a client

Worth doing

  • Walk the actual site before committing to a fixed price.
  • Itemize disposal, permits and prep as their own lines.
  • Write down what is excluded, not only what is included.
  • Compare these rates against your own last three invoices.

Where bids go wrong

  • Using a national average as if it were a local quote.
  • Forgetting that overhead is a real cost, not profit.
  • Absorbing prep and access problems instead of pricing them.
  • Quoting from memory when material prices moved.

Frequently asked questions

How much should I charge for a bathroom remodel?

A mid-range full bathroom remodel usually prices at about $12,000 to $23,000 all in, before permits and repairs found behind the walls. Small refreshes that keep the layout cost less; moving plumbing or going to floor-to-ceiling tile costs more. Build it from line items so the client sees where the money goes.

Should I quote a bathroom remodel as one price or itemized?

Itemize. Demo, plumbing, waterproofing, tile, fixtures and electrical as separate lines make the number defensible and make change orders simple when the client upgrades a fixture mid-job. A single lump sum invites haggling.

What percentage of a bathroom remodel is labor?

Usually around half, a bit more on tiled showers and demo-heavy jobs. Fixture-heavy jobs with expensive vanities and glass shift the split toward materials.

How do I handle hidden damage in a bathroom quote?

Write an allowance or an exclusion for rot, subfloor and plumbing found during demo, with a per-hour or per-square-foot repair rate in the proposal. Agreeing on that rate before work starts prevents the hardest conversation in remodeling.

Other trades

Turn these rates into a sent proposal

A table is a starting point. Describe the job in plain words and Takeoff Convert prices it with cited starting prices (government wage data for labor, live supplier prices for materials where it can find them) that learn your own as you win jobs, then produces an itemized proposal your client can e-sign.

Try it free